Skip to content
Select language:English
Select theme

Process your first pick list

Take a pick list from Waiting through to Done and collect the components.

Updated

Prerequisites: A pick list has been generated for a tool. Required permission: Inventory → Pick Lists — User or above. Admins can validate any pick list; Managers and Users only the pick lists they created.

  1. In the sidebar, click Inventory → Pick Lists (or open it directly from the tool record).
  2. Click Mark as Todo. Tooling Metrics checks stock at the source Warehouse Access Point and sets each line’s status — Available, Partial Available, or Waiting.
  3. Once every line is Available, click Check Availability if needed to move the pick list to Ready.
  4. For a serialized component, pick it at the WAP terminal by scanning or entering its serial number — the line updates as pieces are matched. A non-serialized component just needs the quantity confirmed.
  5. Click Validate.

The pick list moves to Done. For each line:

  • On-hand quantity decreases at the storage location.
  • In-circulation quantity increases on the item.
  • The item lands on the tool — logged on its Assembly History tab and showing on its Items List.

The tool is now ready to be physically assembled and, once built, transferred to the machine.

If a line can’t be fully covered, it stays Waiting or Partial Available — it isn’t a dead end. Click Check Availability again once stock is replenished, or Cancel the pick list if you need to release the reservation and start over.

Set up the machine — release the tool and transfer it to the machine.